Allocation Examples

Allocation Examples

Allocation Examples

This is where you set up bill to allow you the ability to run billing reports that are related directly to the specific allocation.

In the example below we have set up this T&M Bill for (3) Allocations. (Structure | Contents | Mold)

The Job Numbers are set up to allow us to identify each allocation - We also set up for Progress Billing - We named this Billing Period One

  • Structure - 13-9870-S - We added the S to the end of the Actual Job Number for Structure

  • Structure Mold - 13-9870-SM - We added the SM to the end of the Actual Job Number for Structure Mold

  • Contents - 13-9871-C - We added the C to the end of the Actual Job Number for Contents

Below is how we set up the Allocations - This table is found on the Project Settings


Now that we have this set up we can now choose the correct allocation during the input of EVERY item in the bill - These will now be in Allocation Drop Downs found on each of the Input Dialogs. see image below




    • Related Articles

    • Allocation Settings

      Project Settings - Allocations Allocations appear the same on ALL Input Dialog. What is set up on the Allocations Settings will appear in the drop-downs. You can also type an Allocation here, and it will be added to the Allocation Table. Below is ...
    • Allocation Reports

      Allocation Reports Allocation Example -  Need to capture data for each Building Number and Unit Number - See proper set up below Creating Field Sheets and T&M Pro Reports for Allocations Be sure to save your file with the name of the allocation.  ...
    • Allocation Reports

      Allocation Reports Click on the Custom Reports Menu to Expand to Sub-menus - Click On Allocation Reports (see image below) To Create Specific Allocation Reports User MUST have entered Allocation Reference during the Bill Input  Choose the Allocation ...
    • Subcontractor / Vendor - Add

      Subcontractor / Vendors - Add To Open Subcontractor / Vendor Input Page - Click on Tab - (see image below) To Enter an Input  Click ADD to open Input Dialog (see image below)  Once you have several Subcontractor/Vendor inputs - to navigate from input ...
    • Materials and Consumables - Add

      Materials and Consumables  To Open Materials and Consumables Input Page - Click on Tab - (see image below) To Enter an Input   Click ADD to open Input Dialog (see image below)  Once you have several inputs - to navigate from input page to input page ...