Project Settings - Travel Rate
Reduce By Travel Rate for Labor
About Reduce Labor Hourly Rate by %
Feature
You can set this to reduce the labor rate by a percentage
Example - Published Labor Rate for Project Manager is $90.00
Per Hour
You need to bill this at $45.00 per hour - You would Enter
50.00 (50.00%) in the box (see image below)
In order to APPLY the Travel Rate Rule - This is done by
checking the box on the Labor Input Dialog (see image below)
See Example Below on how this should look in Estimate Summary
Related Articles
Travel Rate Settings
Travel Rate Reduction Feature Hourly travel rates can be specified as a percentage of the regular hourly rate in your project settings file. In the example below, the percent of reduction is set to [50.00] Accordingly, a published labor rate of $55 ...
Project Settings - Pro Rate and Duplication Rule
Pro Rate and Duplication Rule About Pro Rate Feature Pro Rate Feature Defined - Program will automatically Pro Rate all Associated Fees based on an 8 Hour Day Example - Daily Rate for Truck is $50.00 Labor works 4 hours - Program Bills $25.00 If ...
Project Settings - Project Cost Setup
Project Cost Set Up - Showing Two Options for Materials | Equipment | Specialty Items Project Cost can be set up with cost and percentages. The Best way is to Export Price List to Excel and then Import it back into the program to convert to the ...
Project Settings - Small Tools
Setting Up Rates and Billing for Small Tools Small Tools is commonly billed as an Associated Labor Fee item in Time and Materials based billing. This guide outlines example rates and methods of attribution. The most common method for billing Small ...
Project Settings - Hotels / Lodging
To Set Up Hotels and Lodging: Under the 'Estimator Data Files' menu, click to open the 'Project Settings File' Click on 'Open Hotel / Lodging Set Up Dialog' as shown below To Add Hotels: Click the 'ADD' button to open the HOTEL | LODGING SET UP ...