Understanding Material Data Input into T&M Go
The Items will automatically be listed on the Material Input Page - These are 
extracted from the price data file uploaded for this T&M Go project. 
Data Input for Materials
We have made this very simple for the user - All the user will need to do is 
input the QTY for each item that will be billed for the project and has the ability to input other items as shown below. This input is for one day 
only.   
Items Available for Input
- Date - Enter the Date for day you are billing these items 
- set the date on the first cell and then place mouse over date and right click 
and click on Set all columns to this value. The date will automatically be set 
for all items. Date format "MUST" be Month/Day/Year - (06/4/2018) - no other format is allowed or accepted.
 
- Quantity - Enter the Total QTY for the item you are 
billing
 
- Note - This is for Item input note - This is not required
 
- Allocation #1 - Allocation #6 - If you are using 
allocations you can enter these here. Tax - If you are billing tax then select tax from drop 
down.   This can also be done at a later time either in the generated report or 
in T&M Pro.  Not required
 
- Identifier - If you are using identifiers enter them here 
- this input is optional and not required
 
- Category | Phase Code | Description - If you are using 
Phase Codes Enter them here.  These must match the phase codes enter into the 
Project Settings File.  These can be added at a later time either in the report 
or in T&M Pro
 
Below is how the Materials Page will appear in T&M Go 
.  
Below is an Example of the Material Page with Data Input