Project Settings - Pro Rate and Duplication Rule

Project Settings - Pro Rate and Duplication Rule

Pro Rate and Duplication Rule
About Pro Rate Feature
  • Pro Rate Feature Defined - Program will automatically Pro Rate all Associated Fees based on an 8 Hour Day
  • Example - Daily Rate for Truck is $50.00 Labor works 4 hours - Program Bills $25.00
  • If labor works more than 8 Hours in a day then program caps the item to daily rate.
  • If User Disables then the program would have billed the vehicle at full daily rate of $50.00


About Duplication Feature
  • Duplication Feature can only disabled on a temporary basis.  Default is always Enabled
  • When a User enters a duplicate entry program will flag entry by highlighting it Yellow.

Why would you disable the Duplication Rule?  You may be working on a bill that a labor works on different allocations or labor classes which require you to enter labor multiple times in the same day. 


    • Related Articles

    • Pro Rate and Duplication Rule

      Project Settings - Pro-Rate and Duplication Rule About Pro-Rate Feature Pro-Rate Feature Defined - Program will automatically Pro Rate all Associated Fees based on an 8 Hour Day  Example - Daily Rate for Truck is $50.00 Labor works 4 hours - Program ...
    • Project Settings - Travel Rate

      Reduce By Travel Rate for Labor  About Reduce Labor Hourly Rate by % Feature You can set this to reduce the labor rate by a percentage Example - Published Labor Rate for Project Manager is $90.00 Per Hour You need to bill this at $45.00 per hour - ...
    • Travel Rate Settings

      Project Settings - Travel Rate - Reduce Labor Rate By About Reduce Labor Hourly Rate by % Feature You can set this to reduce the labor rate by a percentage  Example - Published Labor Rate for Project Manager is $90.00 Per Hour  You need to bill this ...
    • Special PT Rule

      Premium Time Rule Settings  How to Set PT Settings for the Special PT Rule - Override to Default Rule for Specific Labor Input Only This setting will bill Special PT Rule as Follows - Special Premium Time Rule - Specific to Single Labor Input Only - ...
    • Project Settings - Hotels / Lodging

      Setting Up Hotels and Lodging To Open the Hotel and Lodging Table, Open the Project Settings dialog, then click on Open Hotel / Lodging Set Up Dialog (See Below) To Add Hotels Click "ADD" to Open Hotel / Lodging Set up Dialog (see image below) To ...