Project Settings - Pro Rate and Duplication Rule

Project Settings - Pro Rate and Duplication Rule

Pro Rate and Duplication Rule
About Pro Rate Feature
  • Pro Rate Feature Defined - Program will automatically Pro Rate all Associated Fees based on an 8 Hour Day
  • Example - Daily Rate for Truck is $50.00 Labor works 4 hours - Program Bills $25.00
  • If labor works more than 8 Hours in a day then program caps the item to daily rate.
  • If User Disables then the program would have billed the vehicle at full daily rate of $50.00


About Duplication Feature
  • Duplication Feature can only disabled on a temporary basis.  Default is always Enabled
  • When a User enters a duplicate entry program will flag entry by highlighting it Yellow.

Why would you disable the Duplication Rule?  You may be working on a bill that a labor works on different allocations or labor classes which require you to enter labor multiple times in the same day. 


    • Related Articles

    • Pro Rate and Duplication Rule

      Project Settings - Pro-Rate and Duplication Rule Pro-Rate Feature The Pro-Rate feature, when activated, will automatically calculate a labor's Associated Fees based on an 8 hour workday. Example: if the daily rate for a given vehicle is $50.00 and ...
    • Project Settings - Travel Rate

      Reduce By Travel Rate for Labor  About Reduce Labor Hourly Rate by % Feature You can set this to reduce the labor rate by a percentage Example - Published Labor Rate for Project Manager is $90.00 Per Hour You need to bill this at $45.00 per hour - ...
    • Travel Rate Settings

      Travel Rate Reduction Feature Hourly travel rates can be specified as a percentage of the regular hourly rate in your project settings file. In the example below, the percent of reduction is set to [50.00] Accordingly, a published labor rate of $55 ...
    • Special PT Rule

      Premium Time Rule Settings  How to Set PT Settings for the Special PT Rule - Override to Default Rule for Specific Labor Input Only This setting will bill Special PT Rule as Follows - Special Premium Time Rule - Specific to Single Labor Input Only - ...
    • Project Settings - Project Cost Setup

      Project Cost Set Up - Showing Two Options for Materials | Equipment | Specialty Items Project Cost can be set up with cost and percentages. The Best way is to Export Price List to Excel and then Import it back into the program to convert to the ...